Fixed export rate

3.84 cents/kWh summer; 3.39 cents/kWh winter

Ameren Missouri · Missouri

Effective June 1, 2026

Current tariff identifies these as the Net Metering Rate (Avoided Fuel Cost); summer is June-September and winter is October-May. Ameren's approved rate-options tariff is Tracking No. JE-2026-0130 in File No. ER-2024-0319.

Source: efis.psc.mo.gov · efis.psc.mo.gov

Full Ameren Missouri detail →

Missouri's Net Metering and Easy Connection Act requires retail electric suppliers to offer net metering for qualifying renewable systems up to 100 kW, with excess generation credited at no less than the utility's avoided fuel cost and carried to the next billing period. The Missouri PSC rule requires each regulated utility's net-metering rate to equal its cogeneration rate. Current primary-source tariff evidence shows Ameren Missouri at 3.84 cents/kWh summer and 3.39 cents/kWh winter; Evergy Missouri tariffs use utility-specific avoided-fuel-cost rates, with Evergy Missouri West's filed 2025 rate shown as $0.0233/kWh and Evergy Missouri Metro's cited tariff rate as $0.0218/kWh.

Program details

Compensation mechanismStatutory net metering: imports and exports are measured over the billing period; when exports exceed imports, the customer is credited at least the utility's avoided fuel cost and the credit is applied to the following billing period. The Missouri rule requires the net-metering rate to be the same as the utility's cogeneration rate.
Export rateUtility-specific avoided-fuel-cost/cogeneration rate, not a single statewide retail rate. Ameren Missouri's current tariff states 3.84 cents per kWh summer and 3.39 cents per kWh winter; Evergy Missouri West's filed rate is $0.0233/kWh and the cited Evergy Missouri Metro tariff rate is $0.0218/kWh.
Rate effectiveAmeren Missouri tariff effective June 1, 2026: 3.84 cents/kWh summer and 3.39 cents/kWh winter. Evergy Missouri West's cited compliance tariff rates became effective January 1, 2025; Evergy Missouri Metro's cited rate filing had a proposed effective date of February 16, 2023.
Credit rolloverYes. Excess-generation credits are applied to the following billing period; the utility tariffs and statute do not provide retail-rate cash-out for ordinary monthly excess generation.
Credit expirationCredits expire without compensation at the earlier of twelve months after issuance or when the customer-generator disconnects service or terminates the net-metering relationship.
Annual true-upNo separate statewide annual true-up date was verified. Missouri reconciles excess generation through the billing-period credit mechanism; credits expire on the statutory twelve-month/disconnection rule.
Residential system cap100 kW maximum generating-system capacity for a qualifying customer-generator; the statute and PSC rule do not create a separate residential cap below that statewide eligibility limit.
Commercial system cap100 kW maximum generating-system capacity for a qualifying customer-generator; the same statewide eligibility limit applies to commercial customer-generators covered by the Act and PSC rule.
Aggregate program cap5% of the retail electric supplier's prior-year single-hour peak load, with authority for the Commission or other governing body to increase the amount above 5%; additionally, a supplier need not approve applications once approvals in a calendar year reach 1% of prior-year single-hour peak load.
Program statusThe statutory 5% supplier-level threshold and 1% annual approval threshold remain the governing statewide limits unless the applicable Commission or governing body increases the 5% amount.
RegulatorMissouri Public Service Commission (Missouri PSC) for regulated electrical corporations; municipal utilities and rural electric cooperatives use their respective governing bodies under the Act.
DocketAmeren Missouri: File No. ER-2024-0319, Tracking No. JE-2026-0130 (approved net-metering rate-options tariff effective June 1, 2026). Evergy Missouri West: File No. ER-2024-0189, Tariff No. JE-2024-0110. Evergy Missouri Metro: Case No. ET-2025-0286 concerns proposed TOU net-metering tariff changes.
Governing ruleRSMo 386.890, the Net Metering and Easy Connection Act, implemented for regulated electric utilities by 20 CSR 4240-20.065 (formerly 4 CSR 240-20.065). The user-suggested RSMo 393.1080 is not the current net-metering authority identified in the primary statute and PSC rule.
GrandfatheringNo separate statewide legacy-rate grandfathering provision was verified. The statute instead applies the same billing, credit-expiration, and customer-generator rules to qualifying systems; any utility-specific tariff treatment must be read from that utility's filed tariff.
Interconnection applicationSubmit the utility's net-metering interconnection application with the system plan, wiring diagram, and specifications. The PSC model application requires sections A-D and supporting plans; the utility gives approval or denial within 30 days for systems 10 kW or less and within 90 days for larger qualifying systems, followed by construction, post-construction sections, inspection, certification, and written approval before parallel operation.
Interconnection timelineUtility response: within 30 days for systems 10 kW or less and within 90 days for larger systems. After required post-construction documentation, the PSC model application provides a 21-day utility inspection/notification step; an approved application expires if interconnection is not completed within one year.
Pending changeEvergy Missouri Metro's proposed time-of-use net-metering tariff change is in Case No. ET-2025-0286; the PSC Staff memorandum states Staff could not recommend approval because the proposed billing practices were not consistent with the Net Metering and Easy Connection Act. No later approved change was verified in the cited primary document.

Rates by utility

State rules set the framework. Individual utilities often pay something different, and where they do the utility tariff governs.

Ameren Missouri3.84 cents/kWh summer; 3.39 cents/kWh winter
June 1, 2026
Current tariff identifies these as the Net Metering Rate (Avoided Fuel Cost); summer is June-September and winter is October-May. Ameren's approved rate-options tariff is Tracking No. JE-2026-0130 in File No. ER-2024-0319.
Evergy Missouri West$0.0233/kWh
January 1, 2025 compliance tariff effective date
The PSC-filed EMW settlement/compliance material identifies net metering at $0.0233/kWh and states excess kWh are credited at the Schedule Cogeneration Purchase rate calculated from avoided fuel cost.
Evergy Missouri Metro$0.0218/kWh in the cited PSC tariff filing; current numeric 2026 rate not separately verified
The cited filing proposed February 16, 2023
The Metro tariff states payment of $0.0218/kWh for all kWh received; its 2025 TOU tariff says excess kWh are credited at the Parallel Generation Contract Service avoided-fuel-cost rate. The record does not carry forward the 2023 figure as a verified 2026 rate.