Fixed export rate
Schedule 137: 4.855 cents/kWh June–September; 4.033 cents/kWh October–May. Legacy customers may be on Schedule 135 or 136.
Rocky Mountain Power (Utah) · Utah
Schedule 137 is net billing with seasonal export credits; credits carry over during the annualized billing period and expire at its conclusion.
Source: pscdocs.utah.gov · rockymountainpower.net
Full Rocky Mountain Power (Utah) detail →Utah rules that apply to Rocky Mountain Power (Utah)
The state framework sets the default. Where Rocky Mountain Power (Utah) pays something different, the utility tariff governs and is what the card above reports.
| Compensation mechanism | Rocky Mountain Power Schedule 137 net billing: customer consumption is billed under the applicable standard tariff and exported energy receives a seasonal export credit. |
|---|---|
| Export rate | Schedule 137: 4.855 cents/kWh for exports in June through September; 4.033 cents/kWh for exports in October through May. |
| Rate effective | March 1, 2026. |
| Credit rollover | Excess Schedule 137 credits carry over to the next monthly bill during the Annualized Billing Period. |
| Credit expiration | Unused credits expire at the regularly scheduled meter reading at the conclusion of the Annualized Billing Period. |
| Annual true-up | For most Schedule 137 customers, the Annualized Billing Period ends at the regularly scheduled March meter reading; Schedule 10 customers use the October meter reading. |
| Aggregate program cap | No program-wide aggregate capacity cap is stated in current Schedule 137. |
| Program status | open for Schedule 137 applications, subject to the stated system-size limits and interconnection requirements; the legacy Schedules 135 and 136 are closed to new applications. |
| Grandfathering | Existing customers remain on their enrollment tariff: Schedule 135 is closed to new service and Schedule 136 is closed to applications as of October 31, 2020; Schedule 136 service terminates December 31, 2032 and Schedule 135 service terminates December 31, 2035. |
| Regulator | Public Service Commission of Utah. |
| Governing rule | Utah Code Ann. §§ 54-15-101 to 54-15-106 and PSC rule R746-312 are cited in Rocky Mountain Power's Schedule 135 tariff; Schedule 137 is the current net-billing tariff for new customers. |
| Pending change | None identified: the 2026 Schedule 137 revision was approved effective March 1, 2026. |